Smart metering
Smart Metering Experience
INTERSTE’s distribution investment strategy draws on the Nigerian metering experience of KAYZ Consortium Limited, in which INTERSTE has an indirect interest. This page sets out the KAYZ track record. More about INTERSTE and KAYZ
Meter testing workstation · Photo: KAYZ Consortium
OVERVIEW · KAYZ CONSORTIUM LIMITED
1,850,645Meters delivered
418K+Meters installed for Aba Power Limited Electric (APL)by KAYZ, 2024–presentView project 7+DisCos served under MAP
- CAPACITYProduction capacity of 1.2M meters a year
- In metering since 2014
- KAYZ established 2002
- Facilities: Abuja and Abia State
Cumulative figures unless stated. Each figure is a separate measure.
In the press: KAYZ Consortium featured in The Guardian (Nigeria), 12–13 September 2026: ‘Beyond the meter’.
Selected Project Deliveries
Selected projects delivered by KAYZ Consortium Limited.
| Client | Delivery year(s) | Quantity | Product type | Contracting entity |
|---|---|---|---|---|
| APL | 2024–present | Over 418,000 installed | Prepayment meters | KAYZ Consortium Limited |
Further deliveries – MAP programmes
| Client | Delivery year(s) | Quantity | Contracting entity |
|---|---|---|---|
| AEDC (Abuja Electricity Distribution Company), MAP programme | 2022–2025 | About 30,000 meters a year | KAYZ Consortium Limited |
| IBEDC (Ibadan Electricity Distribution Company), MAP programme | 2022–2025 | About 30,000 meters a year | KAYZ Consortium Limited |
DisCos served under MAP include AEDC, IBEDC and Benin DisCo.
Products
The KAYZ product range.




Facilities
KAYZ Consortium Limited operates facilities in Abuja and at KAYZ Industrial Park, Ohafia, Abia State.






Systems
5 systems
- Head-End Systems (HES)
- Advanced Metering Infrastructure (AMI)
- Meter Data Management (MDM)
- Billing and vending systems
- Revenue collection and commercial performance monitoring